Construction is in “full swing” at the park. Within the next month, much construction activity will be occurring, particularly concrete walls and paving, so you’ll start to see the park really take shape! Here are some photos highlights of the construction process thus far:

5

Concrete Slab Demolition

Site Demolition

Throughout the Summer, the old play equipment was dismantled, trees removed, and the existing concrete slab was jackhammered out, leaving a “clean” site, ready for construction!

2

September – the main elements of the site were excavated. This area will be where the future walls and sloped walkway will go. The large trees to remain are protected with a fabric that is kept moist during the warm months.

4

Concrete forming

3

Rebar and concrete forms are set for the retaining wall.