Construction at Francisco Park continues to move along smoothly.  The elevated pathway structure has been painted and the crew is starting to install the boardwalk.  Form work for the concrete at the Bay Street entrance is installed and concrete flat work is underway throughout the park. The contractor has been performing fine grading of the hillside, erosion control measures, and preparation for planting to come in January.  Construction on the Maria Manetti Shrem Community Garden continues and the dog play area is formed and ready for the concrete pour.

Francisco Park dec 2020 111

A bird’s eye view of the area where the main lawn will be installed and Hyde Street in the background.  The top of the elevated walkway can be seen to the left and the trellis to the right.


Francisco Park dec 2020 222

Light poles have been delivered and are being installed throughout the park.


Francisco Park dec 2020 333

The community garden taking shape, with the dog play area below in the background.


Francisco Park dec 2020 444

The structure for the elevated pathway has been painted and the boardwalk is being installed.


Francisco Park dec 2020 555

Bay Street entrance form work underway


Francisco Park dec 2020 666

Concrete flat work happening in front of the historic reservoir berm.