2 inches of fine asphalt was laid during the last week of August. After the asphalt cured, the Sportsmaster Skatemaster system was applied; first with a layer of acrylic then later with a sealant atop. The project will look to develop the adjacent landscape strip, paint curbs, and add furnishings back to the space with a new layout.



