- EXPLORE OUR PARKS
- Park Improvements
- Active Park Projects
- McLaren Park
- McLaren Park - Yosemite Creek Daylighting Project
McLaren Park - Yosemite Creek Daylighting Project
Background
The San Francisco Recreation and Park Department, in partnership with the San Francisco Public Utilities Commission, is daylighting the historic Yosemite Creek in McLaren Park and piloting a high efficiency irrigation/stormwater reuse system at the Louis Sutter playfield.
The Yosemite Creek Daylighting Project is situated within McLaren Park on the northern side, bordering the neighborhood of University Mound. The historic Yosemite Creek passes through Recreation and Parks property in this area. The scope of work consists of uncovering portions of Yosemite Creek within in McLaren Park from underground and bringing them to the surface, all the way from Yosemite Marsh to the Louis Sutter Baseball Diamond. The creek daylighting includes the creation of new pathways, sidewalks on Wayland Street, stream crossings, and the creation of a gathering space, “Yosemite Station” at the edge of McLaren Park. Additionally, the Louis Sutter Soccer Field Pilot Project will involve conducting a five-year pilot project to test a high efficiency irrigation/stormwater reuse system, a first for the City of San Francisco. The Yosemite Creek Daylighting Project is the last of the eight Early Implementation Projects that SFPUC is constructing over the coming years. These projects are part of the Wastewater Capital Improvement Program, a multi-billion-dollar citywide investment to upgrade aging sewer infrastructure.
Quick Links
- Upper Yosemite Creek Daylighting Fact Sheet (March 2023)
- SFPUC Green Infrastructure
- SFPUC Sewer System Improvement Program (SSIP)
Please visit the SFPUC’s Green Infrastructure page for more information, and direct your comments and questions on the project to SFPUC’s Sewer System Improvement Program Outreach Team at ssip@sfwater.org.
Project Goals
- Daylight a historic creek in San Francisco, a first for the City
- Provide stormwater management by:
- Reducing combined sewer discharge (CSD)
- Reducing localized flooding
- Improving drainage in this area of the McLaren Park
- Create a community amenity
- Enhance habitat/biodiversity
- Facilitate educational opportunities
Project Elements
Yosemite Creek Daylighting Project - The Yosemite Creek Daylighting Project will restore Yosemite Creek’s flow from subsurface pipes to an open water channel by daylighting approximately 1,700 feet of Yosemite Creek between Bacon and Oxford Streets (Yosemite Marsh) and Wayland and University Streets to convey stormwater adjacent to, or within, the right-of-way (ROW) and through McLaren Park before returning to the combined sewer system. An additional 400-foot section of storm drainpipe will convey flow underground through one residential block of Wayland Street, resulting in a total length of new creek run measuring 2,100 linear feet. Bioretention basins along the stream channel will allow water to infiltrate the soil, reducing the volume of stormwater that flows into the combined sewer system. Also, SFPUC will create a gathering space called the Yosemite Creek Station along the creek near the Wayland and Princeton Streets intersection to provide a public amenity, increase public awareness about San Francisco’s urban watersheds and deliver educational opportunities.
Soccer Field Pilot Project - The Soccer Field Pilot Project will involve conducting a five-year pilot project to test a high-efficiency irrigation/stormwater reuse system at the Louis Sutter Playground soccer field. Stormwater collected in subsurface storage tanks will be used to irrigate the improved soccer field thereby reducing the Department’s potable water use and improving the soccer field drainage. The SFRPD is providing direction for the pilot project as well as long-term management following the pilot project. A maintenance and monitoring partnership structure is described in the draft MOU, with the SFPUC and SFRPD sharing responsibilities for the pilot project.
Funding
- The SFPUC shall fund design, construction and maintenance of the Project as described in the draft MOU between SFRPD and SFPUC.
- Project Budget: ~$19 Million (amount to be determined based on final scope)
- Funding Sources: SFPUC Sewer System Improvement Program (SSIP)
Project Schedule
Phase | Timeline |
Planning | Spring 2017 |
Design | Fall 2022 |
Construction | 2024 - 2026 |
Open to the public | Spring 2026 |
Project Updates
If you would like to sign-up for Project Update blog posts like the ones below, click here, scroll down to the News Flash section, and then select "RPD Park Improvements | All Project Updates" to receive updates on all our active projects, or pick-and-choose your blog subscriptions by project name. You’ll receive an email that includes a link to confirm your new subscription for each blog for which you sign-up.
-
-
McLaren Park Vision Plan Update + Upper Yosemite Creek Daylighting Project | August 2023
Hello neighbors! We have two important updates to share about John McLaren Park. The McLaren Park Planning Survey has been extended through 8/25/2023 Read on... -
Complete the McLaren Park 2020 Bond Planning priorities survey
We’ve created a new map-based survey to collect your thoughts on possible programming, infrastructure, and connectivity improvements in John McLaren Park. Please take 15-20 minutes Read on... -
Yosemite Creek Daylighting Project Update | March 2023
We are excited to share these project updates and updated fact sheet for March 2023 Read on... -
SF Rec and Park Commission Meeting at Joe Lee Rec Center | March 16 at 10 a.m.
Come meet your Rec and Park Commissioners at our offsite Commission meeting at Joe Lee Rec Center Read on... -
Yosemite Creek Daylighting Project Update January 2022
Yosemite Creek Daylighting Project is moving forward following a number of Commission approvals Read on...
Project Details
Commission Materials
Community Meetings - Notes and Presentations
- N/A
-
Omar Davis
Project ManagerPhone: 1-628-652-6644