Upper Douglass Dog Park – Update 4/18/2014

The drain and pipes installation along the southern edge were completed last week.

Sand channel’s two by four foot grid is being installed in the next four to six weeks. The ‘installation truck’ make one by nine inch incisions in the lawn which helps redirect the surface water.