Update – Alta Plaza Irrigation and Drainage Replacement – North Side

On September 21, 2017 Rec and Park Commission approved to award a construction contract for the Alta Plaza Park – North Side Irrigation and Drainage Project to Azul Works Inc. The scope includes: replacement of sod and automatic irrigation system, installation of perimeter drainage, installation Donor Recognition Circle, and installation of a concrete driveway up to new donor site at Scott Street and Washington Street.

This project will take place below ground to repair an out-dated irrigation system, the project will improve the drainage on-site. and  reduce water usage by 2.5 million gallons per year or 39% water reduction.  RPD has worked closely the Friends of Alta Plaza Park (FOAPP) to develop the master plan which informs all subsequent work for the site including this project.

Source of Funding: PUC Grant, 2012 Clean and Safe Neighborhood Parks Bond, and an Ad-back from Supervisor Mark Farrell’s Office. Project supported by Supervisor Mark Farrell, Friends of Alta Plaza Park and San Francisco Parks Alliance.