Guy Place – Construction Progress Update

Work required to reinforce the foundation a building adjacent to the park (which must occur before the park walls are built) is temporarily delayed while structural engineering drawings are being revised. This is due to conditions under the building varying from what was anticipated. Work at the park site is expected to resume later this month. In the mean time, progress continues with the submission and approval of material samples and fabricated elements. These items are being addressed off-site due to space constraints.