Project Background
The San Francisco Marina is composed of two harbors, known as East Harbor (also known Gashouse Cove) and West Harbor. The East Harbor consists of 342 boat slips, the City Yachts sales and fuel concession, and parkland, which includes a restroom and two parking lots. The West Harbor consists of the West Harbor marina, the Saint Francis and Golden Gate Yacht Clubs, the Harbor Office Building, and parkland that includes restrooms, a concession stand, and four parking lots. The West Harbor currently includes approximately 326 slips.
The Marina Green, a part of the marina and a major city park, is situated between the East and West Harbors.
The San Francisco Marina facilities have existed in their present configuration since 1963. The floating docks and gangways are made of timber and have degraded over time. The on-dock utilities have degraded as well as become obsolete.
HARBOR RENOVATION PROGRAM
The San Francisco Marina Renovation Project consists of renovations to facilities in both the East and West Harbors of the San Francisco Marina. The project includes waterside improvements over the entire 39-acre waterside portion of the marina and on 12 of the total 19 landslide acres. Approvals and funding is in place to implement Phase I of the project, renovation of the West Harbor.
Proposed marina renovations in the West Harbor include:
- Two new breakwater segments
- Removal of one breakwater structures (mole) near the foot of Scott Street
- Reconstruction of portions of the degraded riprap slopes around the interior shorelines
- Replacement and reconfiguration of the floating docks and slips
- Renovation of existing pump out facility
- Construction of a guest dock and hand boat launch
- Maintenance dredging
- Code upgrades to the harbor office, restrooms and boater showers
- Landscaping, site and public access improvements
Dock improvements will also include upgrades in electrical service, water system and fire protection stations, installation of new lights dock lights, and replacement of gates, ramps and gangways.
Timeline
PHASE I: WEST HARBOR RENOVATION
| May 2009 |
Winzler & Kelly hired as the consulting engineers for the West Harbor Renovation project. |
| May – December 2009 |
Development of preliminary design, plans, and specifications, including coastal engineering, environmental, and geotechnical elements. |
| January – June 2010 |
Development of Bid Documents, and permitting. |
| July – December 2010 |
Bidding, permitting and pre-construction activities. |
| 2011 - 2012 |
Construction is expected to begin in early-2011 and conclude in the summer of 2012. |
PHASE II: EAST HARBOR RENOVATION [SCHEDULE TO BE DETERMINED]